Olympic Games Terminal - London Heathrow
To cope with unprecendented passenger numbers departing Heathrow after the 2012 Olympic Games, BAA are constructing a temporary Departure Terminal for athletes and officials. Webb Yates Engineers are providing civil and structural engineering design services for the project.
Client: BAA
Architect / Designer: Gebler Tooth Architects
CGI: Gebler Tooth Architects
Related Press & Awards
events, infrastructure steel, aluminium, fabric temporary structures, long span